One of the most important things to consider before constructing a railway is the train operating program. However, the analysis of the operating program based train schedule in the railway planning stage is carried out mainly on the basis of the intuitive experiences of the planner, and the optimization of the train schedule under various conditions is not properly considered. This study analyzes...